Project Description
Project Details
- 3 CARS,
- 3 PCRs (3 Productions at the same time),
- 3 Commentary Control Rooms (60 ENG Cameras),
- 5 Studio Lightings (including broadcasting equipment),
- 1 Local CAR, 3 Production Control Room, 1 Main CAR
- 142 Commentary Position, 3 OB compound,
- Special Broadcast Equipment, XEDIO NLE
- 1 CDT, 1 CSC
Built on an area of 1.466.400 m2 in Ashgabat, Olympic Complex will play host to Asian Indoor and Martial Art Games (AIMAG) in 2017 with its high-tech facilities. Started in 2010 and designed in 3 phases, project is aimed to be completed in 2016. Major structures within the first phase of the project which has been built on 679,269 m2 area in April 2014.
This project has been realised with JV company
DATE
2014
LOCATION
Ashgabat / Turkmenistan
CONTRACT VALUE
60 Million USD